Project :
White Rose FPSO Electrical Room Modules (M12/LER)
Client: Aker Maritime Kiewit Construction (AMKC)
Owner: Husky Energy
GJ Cahill, through its subsidiary, North Eastern Constructors Limited (NECL), was responsible for the fabrication, assembly and outfitting of three modules for Husky Energy’s White Rose Floating, Production, Storage and Off-loading (FPSO) vessel. The M12 (main electrical room module) weighing 1200-tonnes, was an air-conditioned control room housing the main control centre for the process trains distributing power and control-system signals to and from the equipment. The smaller module (M09), weighing 200-tonnes, was a local electrical room (LER) which included motor control centers (MCCs) and other power distribution equipment.
In addition to the M12 & M09 modules the company designed and built the turret equipment room for the FPSO through a contract with SBM-IMODCO, Inc.