GJ Cahill was responsible for the construction of the New Truck Loading Terminal at the North Atlantic Refining Limited in Come by Chance, Newfoundland and Labrador. The scope of work involved providing all labour, materials and equipment to install the steel pipe product distribution system, as well as the installation of an electrical building, electrical power distribution, lighting systems, and controls and instrumentation for the new terminal.