GJ Cahill provides a depth of specialized knowledge and hands-on expertise in electrical, mechanical and instrumentation systems. The company brings planning and management expertise to every project from oil & gas to mining, and from transportation to health care. Unparalleled skills, experience and innovation mean that individually, GJ Cahill or together with their subsidiaries and affiliates, provide professional, high quality, cost-effective results.
GJ Cahill’s depth and expertise is demonstrated in each and every project that the company has completed.
.jpg) | The Voisey's Bay Project is one of the world’s largest nickel mines. Construction of the 6000-tonne-per day integrated mine and concentrator at the Voisey’s Bay site in Labrador was completed in November 2005. |
 | GJ Cahill, through its subsidiary, North Eastern Constructors Limited (NECL), fabricated assembled and outfitted a 600-tonne 40-bed additional offshore accommodation module. |
 | Through a sub-contract with DaeWoo Shipbuilding and Marine Engineering Co., GJ Cahill was responsible for the offshore hook-up and commissioning of the ExxonMobil operated Sable Gas Compression Platform. |
 | GJ Cahill was responsible for the construction of the New Truck Loading Terminal at the North Atlantic Refining Limited in Come by Chance, Newfoundland. |
 | G.J. Cahill, through its subsidiary, North Eastern Constructors Limited (NECL), was responsible for the fabrication, assembly and outfitting of three modules for Husky Energy’ White Rose Floating, Production, Storage and Off-loading (FPSO) vessel. |
 | As a member of the Terra Nova Alliance, GJ Cahill, provided engineering, procurement, manufacturing, hookup, commissioning, installation and start-up support for the electrical, instrumentation and control systems for the Terra Nova Floating, Production, Storage and Off-loading (FPSO) vessel. |
 | GJ Cahill participated in all three phases of the construction of the Newfoundland Transshipment Terminal—a 3 million barrel crude oil storage and transshipment facility. |
 | The Granite Canal Hydroelectric Development was a 40 MW project situated within the existing Bay d'Espoir Development in southern Newfoundland. |
 | Stora Enso’s Port Hawkesbury Mill produces 190 000-tonnes of newsprint and 360 000-tonnes of super calendared paper for the catalogue and magazine paper markets, primarily within North America. |
 | The Confederation Bridge is the world's longest bridge over ice-covered water stretching for 12.9 kilometers from New Brunswick to Prince Edward Island. |
 | The Hibernia Project at Bull Arm, Newfoundland was North America's largest construction project for most of the early 1990s. |
 | G.J. Cahill participated in the Coleson Cove refurbishment project. The work consisted of installing and commissioning the power and control systems for the new “Flue Gas Desulphurization” building. |
 | The oil sands of Alberta contain over 300 billion barrels of oil reserves. Canadian Natural Resources Limited is involved in the extraction of these reserves utilizing both open pit mining and in-situ techniques.
The Horizon Oil Sands Project will utilize open pit mining methods. |
 | GJ Cahill, through its wholly owned subsidiary, North Eastern Constructors Limited (NECL) was awarded the fabrication of the subsea manifolds for the North Amethyst offshore oil development, operated by Husky Energy. |
 | GJ Cahill was contracted to complete the process mechanical, electrical, building mechanical, HVAC, instrumentation, controls and commissioning for this project.
|
 | This Electrical, Instrumentation and Mechanical contract involves providing a number of design, supply and install packages for the operation of the powerhouse management systems. |